Direct naar content

New version of MSP Wholesale electricity available on the Energiedatawijzer

The introduction of the Energy Act will not only lead to substantive changes, but also to textual changes in sector documents. For example, the Market and Sub-Processes (MSP) Wholesale Electricity has been updated.

The textual changes are made on the basis of the Energy Act Terminology Memorandum. This memorandum establishes new terminology and ensures a consistent and uniform spelling of different concepts.
In the new version (4.0) of the MSP, we have also incorporated the following:

  • The topics with implementation date May 1, 2026:
    • TS039-IC283 ‘Restantvolume configuratie’ (‘Residual Volume Configuration’)
    • TS040-IC258 ‘Slimmemeterallocatie’ (‘Smart Meter Allocation’)
  • the RFCs with implementation date 1 May 2026:
    • RFC-028-A2.0-TR4-TS040 ‘Herberekening DPF op D+2’ (‘Recalculation DPF on D+2’)
    • RFC-049-A2.0-TR4-TS039 ‘Negatieve netverliesvolumes’ (‘Negative Grid Loss Volumes’)
    • RFC-065-A20-TR4-TS040 ‘IC258 Calamiteitenproces in lijn met verantwoordelijkheden DPF’ (‘IC258 Emergency process in line with DPF responsibilities’)

Gerelateerd Nieuws